PVT assembly making good progress in Australia

At the end of April, 28 LG PV panels were disconnected and taken off the roof of the home owner buyer of 28 Thermaltricity thermal cooling panels, shipped from Solar Speedflex Co Ltd (China) along with a complete PPR plumbing system and assembly components.
With the thermal cooling panels attached to the back of the PV panels, the 28 LG PVT panels will be re installed back on the roof, plumbing system completed to join up with the swimming pool equipment.
Temperature and performance data with live video imaging, will become available towards the end of April 2018.